Post Vector
Transit Date:
Thursday, August 5, 2021 - 16:49 to 19:42
Departure Location:
Vector Yacht Services
Arrival Location:
Cadboro Bay
Total time:
2H 53M
Sailing Hours:
0.00
Engine Hours:
3.00
Max speed:
7.80kts
Average speed:
5.80kts
Distance:
16.80NM
What a difference a clean bottom makes.
She sliced through the water like a razor. No vibrations on the tiller. And very fast. Less than 3 hours from Tsehum Harbour! Wow.
Wind was calm until lower Haro then all hell broke loose. No problem for a re-born T2!